How Pricing Works.
Engineering-First Engagement.

Phase 1 is complimentary. Most DFM & engineering reviews range $500–$2,500 (applicable toward tooling). Full turnkey projects: project-scoped quotes, typically from $15K. No opaque broker markup.

Low-friction start: 15-minute feasibility call first, then a complimentary DFM review once NDA is in place.

Clear fee logic. No opaque broker markup.

Mold flow and thermal analysis for die-casting DFM

How We Start

Two Steps. Zero Commitment Until You See Value.

We don't ask for your CAD on day one. We start with a conversation — then earn the right to review your designs.

Step 1

15-Min Engineer Call

Tell us your challenge — thermal, sealing, EMI, or something else. We'll ask 3 quick questions to assess fit and give you initial direction. No drawings needed.

Describe your use-case and main technical challenge

We confirm if your project matches our expertise

You get initial direction — no generic sales pitch

or
Chat on WhatsApp
Step 2

DFM & Risk Review

If the call shows we can help, we send our standard NDA. Once signed, you upload STEP/STL files securely. We deliver concrete risk flags within 48 hours.

Standard NDA executed via email

Secure upload of STEP/STL files

3 risk flags + 2 optimizations + cost range in 48h

DFM bottleneck flags

Thermal, porosity, sealing, EMI risks

Supply chain & tariff route

CN-VN-KR options to protect timing

Execution path recommendation

Prototype vs. tooling, decision gates

Already have an NDA in place with us?

The 3-Phase Engagement Model

A structured approach that helps reduce surprises and improves execution confidence

Phase 1

Complimentary Initial Assessment

Free: 15-min call → DFM risk flags within 48 hours

Best for confirming fit before you spend money on tooling or supplier outreach.

What you get

A two-step process: start with a 15-minute engineer call (no drawings needed). If we confirm fit, we sign NDA and you upload STEP/STL files. We deliver an initial DFM & Risk Review within 48 hours.

Deliverables

  • • 15-min engineer call to assess fit
  • • Standard NDA execution
  • • 3 risk flags + 2 optimizations (post-NDA)
  • • 1 cost range estimate + tariff route options

Pricing

Complimentary

No commitment until you see concrete value.

Next Step: If the DFM review shows we can add value, we discuss a deeper engineering engagement with transparent pricing based on your specific complexity and requirements.

Phase 2

Tooling & Prototyping

Direct cost + 15–25% management fee. Tooling and prototype delivery.

Best for proving manufacturability, locking the process, and reducing first-build surprises.

What you get

Precision CNC prototyping or Tier-1 standard die-casting mold fabrication, managed with on-site engineer oversight. Includes CMM inspection reports.

Deliverables

  • • First article inspection report (FAI)
  • • CMM data on critical dimensions
  • • Cpk capability study
  • • Surface finish measurement (Ra)

Pricing

Direct Cost + Fee

Flat Management Fee: 15% - 25%

Why it works: You get access to carefully pre-qualified telecom-grade factories in Asia with clear management-fee disclosure instead of opaque broker markups.

Phase 3

Managed Production

Per-unit quote. Flexible MOQ. Full QC and shipment release.

Best for repeatable delivery once design, process, and release checks are aligned.

What you get

High-Mix Low-Volume (HMLV) production. We handle CNC multi-stage machining, silver/nickel plating, final assembly, and international shipping.

Deliverables

  • • SPC charts & Cpk data per batch
  • • Plating thickness XRF report
  • • Shipment photos & packing list
  • • Certificate of conformance (CoC)

Pricing

Per Unit Quote

Based on volume with flexible MOQ options.

Value: Delivered ready-to-use with risk-gated validation and release checks, straight to your assembly line.

Execution Model

You focus on 3 inputs. We coordinate the rest.

Built for hardware teams that need engineering depth: flexible MOQ options, fewer sales-layer ping-pong loops, and fewer "lost in translation" handoffs.

Your 3 inputs

1. Share CAD/BOM + target specs (thermal, EMI, sealing, lifecycle).

2. Align on commercial target (cost, timing, volume, risk appetite).

3. Approve decision gates at review milestones.

Our full-stack execution

Stage A: DFM, Moldflow, tolerance & process strategy.

Stage B: Tooling, CNC, metrology, and pilot-loop closure.

Stage C: Production transfer, QA controls, and shipment execution.

Your assigned engineer-to-engineer pod serves as your on-site eyes and ears from first DFM to final release.

Still comparing options? Start with a free DFM assessment — no commitment until you see the value.

No drawings needed. 15-min call → NDA → DFM risk flags in 48 hours.